Needs projects are the major capital improvement projects funded through the SBA's General Construction Fund. County Boards of Education submit capital improvement projects to the SBA for funding consideration. Projects are submitted and evaluated pursuant to the SBA's Policy and Procedures Handbook - Section 200 and Section 201.
The process involves: Grant Application, SBA and WVBE approval of county CEFP (if necessary), SBA staff review including site visits, interviews by the Authority with County Superintendents and Board Presidents, and review and rating by the Architectural Services Staff. The Authority then completes the process with their deliberation and selection of the projects.
For a PDF copy of FY2015 through FY2025 SBA NEEDS Grant Awards, please CLICK HERE.
FY2026 | |||||
| The following Needs Grant awards were made by the Authority in their December 15, 2025 quarterly meeting: | |||||
| County/Project | Project Cost | Local Funds | Funds Awarded | ||
Barbour Barbour County Consolidation Project | $5,396,185 | $1,896,185 | $3,500,000 | ||
Braxton Braxton County MS HVAC Replacement | $2,484,659 | $168,957 | $2,315,7602 | ||
Clay Clay County HS 7th and 8th Grade Additions | $10,889,415 | $1,889,415 | $9,000,000 | ||
Grant Petersburg HS Renovations and System Replacement | $6,551,730 | $1,500,000 | $5,051,730 | ||
Hardy East Hardy ES Elevator Modernization and Moorefield ES Multipurpose Bldg. Flooring | $345,330 | $50,000 | $295,330 | ||
Harrison Bridgeport HS Addition/Renovations | $6,997,447 | $3,500,000 | $3,497,447 | ||
Logan Man HS HVAC Replacement | $3,734,200 | $373,420 | $3,360,780 | ||
Mercer Phase I Renovations and Additions to Mercer County Tech Center | $15,403,323 | $5,403,323 | $4,800,000* | ||
Mineral Keyser HS Partial HVAC Upgrade and Roof Replacement | $2,979,227 | $979,227 | $2,000,000 | ||
Mingo Lenore PK-8 HVAC Project | $3,767,201 | $1,000,000 | $2,767,201 | ||
Raleigh Renovations to Woodrow Wilson HS (Phase 3) | $27,518,274 | $15,518,274 | $12,000,000 | ||
Tucker Davis Thomas ES Sprinkler/Pump House | $700,542 | $50,000 | $650,542 | ||
| Totals | $86,767,533 | $32,328,801 | $49,238,732 | ||
| Notes: | |||||
| *Indicates an additional SBA commitment of $5,200,000 in FY-2027 Funding Cycle. | |||||
FY2025 | |||||
| The following Needs Grant awards were made by the Authority in their December 17, 2024 quarterly meeting: | |||||
| County/Project | Project Cost | Local Funds | Funds Awarded | ||
Berkeley New Inwood Learning Center | $18,910,000 | $14,910,000 | $4,000,000 | ||
Grant Petersburg High School Safe School Addition/Renovations | $3,361,100 | $1,500,000 | $1,861,100 | ||
Greenbrier White Sulphur Springs Elementary School Addition/Renovations | $14,405,454 | $405,454 | $14,000,000 | ||
Hardy East Hardy ES & Moorefield MS Security Upgrades | $1,022,800 | $100,000 | $922,800 | ||
Harrison Robert C. Byrd Career & Tech Expansion & Mountaineer MS Cafeteria Expansion | $7,313,402 | $2,000,000 | $5,313,402 | ||
Kanawha New Upper Kanawha Valley Consolidated (Dupont) Elementary School | $30,323,602 | $10,000,000 | $6,774,534 * | ||
Logan Man High School Electrical/Fire Alarm Replacement | $4,639,709 | $1,042,975 | $3,596,734 | ||
Marion Marion County Safe School Entrances (9 Schools) | $3,699,927 | $924,982 | $2,774,945 | ||
Monongalia New Suncrest Middle School | $33,965,932 | $16,982,966 | $11,400,437 ** | ||
Monroe James Monroe HS Technical Center Addition/Renovations | $5,323,124 | $800,000 | $4,523,124 | ||
Pleasants Pleasants County Middle School Interior Electric, Lighting, Ceilings, and Sprinkler Upgrades | $1,764,224 | $264,634 | $1,499,590 | ||
Putnam New Hurricane Middle School | $64,628,344 | $39,628,344 | $8,333,334 *** | ||
| Totals | $189,357,618 | $88,559,355 | $65,000,000 | ||
| Notes: | |||||
| *Indicates an additional SBA commitment of $6,774,534 in FY-2026 & $6,774,534 in FY-2027 Funding Cycle. | |||||
| **Indicates an additional SBA commitment of $5,582,529 in FY-2026 Funding Cycle. | |||||
| ***Indicates an additional SBA commitment of $8,333,333 in FY-2026 & $8,333,333 in FY-2027 Funding Cycle. | |||||
FY2024 | |||
| The following Needs Grant awards were made by the Authority in their April 10, 2024 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Brooke Brooke County HS Interior Plumbing Renovations | $6,720,500 | $500,000 | $6,220,500 |
Cabell New Ona Elementary School | $18,910,069 | $2,000,000 | $16,910,069 |
Cabell Cabell Midland HS STEM Classroom Addition/Cafeteria Expansion | $2,679,089 | $1,679,089 | $1,000,000 |
Hardy Moorefield MS HVAC Renovations | $5,324,600 | $0 | $5,324,600 |
Lewis Lewis County HS HVAC Replacement and Interior Upgrades | $11,095,242 | $75,000 | $11,020,242 |
Lewis Roanoke ES Skylight Replacement & Safety Repairs | $292,140 | $50,000 | $242,140 |
Mingo Tug Valley HS Safe School Entrance | $673,127 | $235,594 | $437,533 |
Monongalia Monongalia County Technical Education Center STEM Addition | $5,430,544 | $1,000,000 | $4,430,544 |
Monongalia Mountainview ES Safe School Entrance | $1,183,892 | $295,973 | $887,919 |
Morgan Widmyer ES HVAC Replacement | $4,283,503 | $359,219 | $3,924,284 |
Pocahontas Pocahontas County HS Electric Wiring Upgrades and Gym Floor Renovation | $1,194,170 | $194,170 | $1,000,000 |
Raleigh Woodrow Wilson HS & Academy of Careers and Tech Water Line Replacement | $4,139,052 | $2,069,526 | $2,069,526 |
Randolph Elkins MS Partial Roof Replacement | $1,791,058 | $0 | $1,791,058 |
Summers Summers County Career & Technical Center Roof Renovations | $734,896 | $50,000 | $684,896 |
Tucker Tucker County HS Partial Roof and HVAC Replacement | $6,428,460 | $0 | $6,428,460 |
Wayne A/R to Buffalo MS to create Buffalo PK-8 School | $22,569,800 | $1,920,000 | $20,649,800 |
Webster Glade ES and Webster Springs ES Safe School Entrances/Interior Renovations | $4,769,022 | $225,000 | $4,544,022 |
| Totals | $98,219,164 | $10,653,571 | $87,565,593 |
FY2024 | |||
| The following Needs Grant awards were made by the Authority in their December 11, 2023 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Barbour Phillippi ES Roof Replacement | $1,692,102 | $50,000 | $1,642,102 |
Berkeley New Primary School (K-2), New Primary/Intermediate School (K-2/3-5) | $66,546,738 | $41,546,738 | $25,000,000 |
Calhoun Calhoun MS/HS Chiller and Boiler Replacement | $4,919,829 | $80,000 | $4,839,829 |
Fayette New Midland Trail ES | $21,625,860 | $6,000,000 | $15,625,860 |
Gilmer Gilmer County MS/HS Kitchen Walk-In Freezer Replacement | $805,214 | $80,521 | $724,693 |
Grant Petersburg ES Roof/HVAC Replacement & PreK Addition (4 Classroom) | $5,255,330 | $500,000 | $4,755,330 |
Greenbrier Frankford ES Addition/Renovations | $7,307,058 | $600,000 | $6,707,058 |
Hancock Oak Glen MS Pyrite Remediation | $1,234,650 | $246,930 | $987,720 |
Harrison Nutter Fort Primary, Simpson ES Addition/Renovation | $7,842,600 | $2,000,000 | $5,842,600 |
Jackson Ripley MS Additions & Renovations | $19,547,398 | $6,000,000 | $13,547,398 |
Logan Logan MS Foundation & Structural Steel Stabilization | $3,735,412 | $735,412 | $3,000,000 |
Marshall New Benwood-McMechen ES | $16,295,270 | $7,081,715 | $9,213,555 |
Mason Roosevelt ES Upgrades | $1,249,000 | $0 | $1,249,000 |
Morgan Berkeley Springs HS HVAC Replacement | $407,881 | $40,781 | $367,100 |
Randolph Elkins MS Roof Replacement | $658,110 | $100,000 | $558,110 |
Taylor New Anna Jarvis ES | $24,182,267 | $16,875,667 | $7,306,600 |
Tucker Tucker County HS Waste Water Treatment Plant Replacement | $2,015,945 | $50,000 | $1,965,945 |
Wood New Lubeck ES, Vienna ES, & North Parkersburg ES | $75,328,440 | $47,399,500 | $27,928,940 |
Wyoming New Mullens PK-8 School | $24,464,847 | $8,753,193 | $15,711,654 |
| Totals | $285,113,951 | $138,140,457 | $146,973,493 |
FY2023 | |||
| The following Needs Grant awards were made by the Authority in their December 11, 2022 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
| Multi-Year Commitments from Previous Funding Cycles | |||
Hampshire New Augusta, Romney, and Slanesville Elementary Schools | $8,000,000 | $8,000,000 | |
Lincoln New Duval Area PK-8 School | $10,000,000 | | $10,000,000 |
McDowell New Consolidated Elementary School (Fall River, Kimball, Welch) | $7,500,000 | | $7,500,000 |
| Totals | $25,000,000 | $25,000,000 | |
FY2022 | |||
| The following Needs Grant awards were made by the Authority in their December 13, 2021 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Cabell New Meadows Elementary School | $16,999,000 | $6,999,000 | $10,000,000 |
Kanawha Renovations to Cedar Grove Elementary School | $11,788,285 | $3,288,285 | $8,500,000 |
Lincoln New Duval Area PK-8 School | $27,746,460 | $3,000,000 | $14,746,460 * |
McDowell New Consolidated Elementary School (Fall River, Kimball, Welch) | $18,665,600 | $3,665,600 | $7,500,000 ** |
Taylor Roof Replacement at Grafton High School | $1,183,212 | $363,012 | $820,200 |
| Multi-Year Commitments from Previous Funding Cycles | |||
Hampshire New Augusta, Romney, and Slanesville Elementary Schools | $8,000,000 | | $8,000,000 *** |
Mineral New Frankfort PK-4 Elementary School | $9,573,795 | | $9,573,795 |
| Totals | $93,956,352 | $17,315,897 | $59,140,455 |
| Notes: | |||
| *Indicates an additional SBA commitment of $10,000,000 in the FY-2023 Funding Cycle. | |||
| **Indicates an additional SBA commitment of $7,500,000 in the FY-2023 Funding Cycle. | |||
| ***Indicates an additional SBA commitment of $8,000,000 in the FY-2023 Funding Cycle. | |||
FY2021 | |||
| The following Needs Grant awards were made by the Authority in their April 19, 2021 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Greenbrier Alderson Elementary School Relocation to Community Center | $11,000,000 | $3,000,000 | $8,000,000 |
Hampshire New Augusta, Romney, and Slanesville Elementary Schools | $42,927,955 | $18,927,955 | $8,000,0002 ** |
Jefferson New Shepherdstown Elementary & New Ranson Elementary Schools | $40,013,668 | $32,505,000 | $7,508,668 |
Mercer New Bluewell-Brushfork PK-5 Elementary School | $14,630,821 | $5,000,000 | $9,630,821 |
Mineral New Frankfort PK-4 Elementary School | $21,275,100 | $2,127,510 | $9,573,795 * |
Ohio Renovations to Six (6) Schools | $23,301,212 | $5,301,212 | $18,000,000 |
Roane New Spencer Middle School | $15,500,100 | $1,550,010 | $13,950,090 |
Summers Summers Co Middle-High School Additions / Renovations | $8,199,876 | $ 0 | $8,199,876 |
| Totals | $141,920,777 | $49,483,732 | $82,863,250 |
| Notes: | |||
| *Indicates an additional SBA commitment of $9,573,795 in the FY-2022 Funding Cycle. | |||
| **Indicates an additional SBA commitment of $8,000,000 in the FY-2022 and $8,000,000 in the FY-2023 Funding Cycles. | |||
FY2021 | |||
| The following Needs Grant awards were made by the Authority in their July 30, 2020 special meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Mineral HVAC & Roofing Renovations at Keyser Middle School | $3,731,670 | $645,000 | $3,086,670 |
Raleigh New Stratton Elementary School | $15,882,374 | $7,000,000 | $8,882,374 |
| Totals | $19,614,044 | $7,645,000 | $11,969,044 |
FY2020 | |||
| The following Needs Grant awards were made by the Authority in their December 17, 2019 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Fayette New Meadow Bridge PreK-12 School | $20,012,448 | $0 | $20,012,448 |
Harrison Gore Elementary School Addition / Renovation (Former United HS) | $8,130,000 | $2,000,000 | $6,130,000 |
Marion East Dale Elementary School Addition | $3,154,650 | $1,577,325 | $1,577,325 |
| Multi-Year Commitments from Previous Funding Cycles | |||
Fayette Phase II Upgrades & Renovations to Fayette County Schools | $6,605,223 | | $6,605,223 |
Monroe New Peterstown PreK-8 School | $10,100,000 | | $10,100,000 |
| Totals | $48,002,321 | $3,577,325 | $44,424,996 |
FY2019 | |||
| The following Needs Grant awards were made by the Authority in their December 10, 2018 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Braxton Sutton E.S. HVAC; Braxton Co. HS Kitchen Hood Replacement | $1,082,885 | $250,000 | $832,885 |
Calhoun Pleasant Hill Elementary School HVAC Renovations | $290,359 | $0 | $290,359 |
Clay Clay County High School Additions & Renovations | $9,360,078 | $0 | $9,360,078 |
Fayette Phase II Upgrades & Renovations to Fayette County Schools | $15,210,446 | $2,000,000 | $6,605,223 * |
Grant New Roof & Sewage Treatment Plant at Union Ed. Complex | $1,831,724 | $0 | $1,831,724 |
Lewis Lewis County High School Roof Replacement | $2,593,604 | $0 | $2,593,604 |
Mingo Gilbert PreK-8 Phase II Renovations | $1,943,630 | $200,000 | $1,743,630 |
Monroe New Peterstown PreK-8 School | $24,192,000 | $3,092,000 | $11,000,000 ** |
Morgan Widmyer Elementary School Roof Replacement | $982,607 | $150,000 | $832,067 |
Nicholas Panther Creek ES, Zela ES, Nicholas Co. HS Roof Replacement | $1,207,118 | $241,424 | $965,694 |
Ohio Triadelphia MS & Bridge Street ES Renovations | $11,729,160 | $2,729,160 | $9,000,000 |
Pendleton Pendleton Co. HS & North Fork ES HVAC & Roof Replacement | $8,562,722 | $200,000 | $8,362,722 |
Pleasants Belmont ES, St. Marys ES, Pleasants Co. MS Roof & HVAC Reno. | $1,196,230 | $299,080 | $897,150 |
Putnam Hurricane High School Additions & Renovations | $3,000,233 | $500,000 | $2,500,233 |
Randolph Elkins High School Roofing & HVAC | $2,514,342 | $0 | $2,514,342 |
Summers Summers Co. HS HVAC & Cooling Tower Replacement | $4,125,750 | $0 | $4,125,750 |
Tucker Tucker Valley ES/MS HVAC Renovations | $4,233,743 | $0 | $4,233,743 |
Upshur Hodgesville Elementary School Additions & Renovations | $2,208,389 | $0 | $2,208,389 |
Wayne County-Wide Roof Replacements | $2,826,147 | $262,417 | $2,600,000 |
| Multi-Year Commitments from Previous Funding Cycles | |||
Cabell New Highlawn Elementary School | $2,473,807 | | $2,473,807 |
Mercer New PK-2 Elementary School | $4,516,553 | | $4,516,553 |
Wood Wood Co. Technical Center Additions and Renovations | $2,911,337 | | $2,911,337 |
| Totals | $108,992,324 | $9,924,081 | $82,399,290 |
| Notes: | |||
| *Indicates an additional SBA commitment of $6,605,223 in the FY-2020 Funding Cycle. | |||
| **Indicates an additional SBA commitment of $10,100,000 in the FY-2020 Funding Cycle. | |||
FY2018 | |||
| The following Needs Grant awards were made by the Authority in their December 11, 2017 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Cabell New Highlawn Elementary School | $13,237,078 | $6,618,539 | $4,144,732 * |
Calhoun Calhoun Co. MS-HS Sanitation Renovations | $895,118 | $0 | $895,118 |
Hampshire Augusta Elementary School Partial Roof Replacement | $224,750 | $56,188 | $168,562 |
Hancock Weir Middle School Roof Replacement | $1,270,000 | $270,000 | $1,000,000 |
Kanawha Ben Franklin Career Center HVAC & Roof Replacement | $8,740,949 | $1,748,190 | $6,992,759 |
Lincoln Roof Replacement at Five (5) Schools | $1,208,925 | $208,925 | $1,000,000 |
Mason Fire Alarm System Replacement at Two (2) Schools | $535,846 | $133,961 | $401,885 |
Mercer New PK-2 Elementary School | $12,204,032 | $1,500,000 | $6,187,479 ** |
Mingo Gilbert Elementary / Middle School Renovations | $1,226,365 | $310,000 | $916,365 |
Monongalia Morgantown High School Additions & Renovations | $5,365,510 | $1,341,377 | $4,024,133 |
Monroe New Peterstown PK-8 School | $24,192,000 | $0 | $100,000 *** |
Pleasants Safe School Entrance Renovations at Two (2) Schools | $546,463 | $81,969 | $464,494 |
Preston Roof Replacement at Two (2) Schools | $1,292,400 | $0 | $1,292,400 |
Randolph Additions & Renovations at Two (2) Schools | $5,497,458 | $100,000 | $5,397,458 |
Ritchie Ritchie Co. MS-HS Access Control & Energy Management | $2,016,575 | $604,144 | $1,412,431 |
Tucker Davis Thomas ES-MS Roof Replacement & Site Drainage | $828,647 | $0 | $828,647 |
Tyler Roof Replacement at Two (2) Schools | $1,572,000 | $393,000 | $1,179,000 |
Upshur Tennerton Elementary School Roof Replacement | $546,164 | $0 | $546,164 |
Wayne Spring Valley HS HVAC & Roof Replacement | $3,836,750 | $200,000 | $3,636,750 |
Wirt Wirt Co. Primary-MS Restroom Renovation & Security Upgrades | $1,283,053 | $270,347 | $1,012,706 |
Wood Wood Co. Technical Center Additions & Renovations | $9,992,000 | $2,498,400 | $4,582,263 **** |
Wyoming Wyoming East High School HVAC & Roof Replacement | $4,054,500 | $1,012,000 ***** | $3,042,500 |
| Multi-Year Commitments from Previous Funding Cycles | |||
Fayette New PK-2 Elementary School & New Collins Middle School | $9,385,215 | | $9,385,215 |
| Totals | $109,951,798 | $17,347,040 | $58,611,061 |
| Notes: | |||
| *Indicates an additional SBA commitment of $2,473,807 in the FY-2019 Funding Cycle. | |||
| **Indicates an additional SBA commitment of $4,516,553 in the FY-2019 Funding Cycle. | |||
| ***Indicates the award of a Reserve Grant. | |||
| ****Indicates an additional SBA commitment of $2,911,337 in the FY-2019 Funding Cycle. | |||
| *****Includes a $992,000 QZAB Allocation. | |||
FY2017 | |||
| The following Needs Grant awards were made by the Authority in their December 12, 2016 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Berkeley Energy Management Upgrades | $17,476,000 | $12,576,000 | $4,900,000 * |
Calhoun Calhoun Co. Middle-High School Sanitation Renovations | $189,545 | $0 | $189,545 |
Clay Clay Elementary School Roof Replacement | $160,000 | $5,000 | $155,000 |
Fayette New PK-2 Elementary School & New Collins Middle School | $39,635,712 | $17,000,000 | $13,250,497 ** |
Greenbrier Western Greenbrier Middle School Addition | $5,370,501 | $500,000 | $4,870,501 |
Hardy East Hardy Early-Middle School HVAC & Roof Replacement | $3,500,000 | $500,000 | $3,000,000 |
Mason Roof Replacement at Three (3) Schools | $1,035,775 | $245,055 | $790,720 |
Mercer New Green Valley Elementary School | $12,083,200 | $4,229,120 *** | $7,854,080 |
Monongalia South Middle School Additions & Renovations | $4,192,766 | $2,192,766 | $2,000,000 |
Monroe New Peterstown PK-8 School | $24,192,000 | $10,000,000 **** | $500,000 ***** |
Morgan Berkeley Springs High School Renovations | $6,114,779 | $1,000,000 ****** | $5,114,779 |
Pleasants Pleasants Co. Middle School ADA Restroom Renovations | $538,465 | $80,770 | $457,695 |
Preston Roof Replacement at Four (4) Schools | $789,242 | $0 | $789,242 |
Taylor Taylor Co. Middle School Heat Pump Replacement | $1,973,655 | $600,000 | $1,373,655 |
Tyler Tyler Consolidated High School HVAC Renovations | $4,598,578 | $900,000 | $3,698,578 |
| Multi-Year Commitments from Previous Funding Cycles | |||
Raleigh New Elementary School & Renovations to Shady Spring High School | $10,000,000 | | $10,000,000 |
| Totals | $131,850,218 | $49,828,722 | $58,944,292 |
| Notes: | |||
| *Includes a $100,000 energy grant provided by FirstEnergy. | |||
| **Indicates an additional SBA commitment of $9,385,215 in a future funding cycle. | |||
| ***Includes a $500,000 QZAB Allocation. | |||
| ****Includes a $1,000,000 QZAB Allocation and $8,000,000 in proceeds from an upcoming Bond Issue. | |||
| *****Indicates the award of a Reserve Grant. Project and up to an additional $13,692,000 in future funding is contingent upon the passage of an upcoming Bond Issue. | |||
| ******Includes a $1,000,000 QZAB Allocation. | |||
FY2016 | |||
| The following Needs Grant awards were made by the Authority in their December 14, 2015 quarterly meeting: | |||
| County/Project | Project Cost | Local Funds | Funds Awarded |
Barbour Energy Management Upgrades at Seven Schools | $6,952,522 | $2,359,200 | $4,593,322 |
Calhoun HVAC Renovation & Roof Replacement at Calhoun Middle-High School | $1,146,239 | $50,001 | $1,096,238 |
Doddridge Additions & Renovations at Doddridge Co High School | $2,800,000 | $2,000,000 | $800,000 |
Harrison New Johnson Elementary | $16,778,000 | $6,000,000 | $10,778,000 * |
Jackson Middle School Addition to Ravenswood High School | $13,312,177 | $3,100,000 | $10,212,177 |
Kanawha Additions & Renovations to Andrews Heights Elementary School | $2,955,612 | $1,200,000 | $1,755,612 |
Logan New Chapmanville Elementary | $12,550,144 | $6,050,144 | $6,500,000 |
Monongalia Additions & Renovations to Brookhaven Elementary School | $6,235,000 | $1,875,000 | $4,360,000 |
Pleasants Entrance & ADA Renovations at Pleasants Co Middle School | $372,466 | $55,870 | $316,596 |
Pocahontas Renovations to Marlinton Middle School & Green Bank Elementary School | $6,000,000 | $5,900,000 ** | $100,000 *** |
Raleigh New Elementary School & Renovations to Shady Spring High School | $40,815,548 | $20,815,548 | $10,000,000 **** |
Roane Physical Education Addition at Spencer Elementary School | $1,077,900 | $107,790 | $970,110 |
Tucker HVAC Renovations at Tucker County High School | $2,506,839 | $200,000 | $2,306,839 |
Webster Roof Renovations at Webster Springs Elementary School | $741,078 | $25,000 | $716,078 |
Wirt Roof Replacement & Exterior Waterproofing at Two Schools | $2,659,651 | $500,000 | $2,159,651 |
| Total | $116,903,176 | $50,238,553 | $56,664,623 |
| Notes: | |||
| * Includes a $100,000 energy grant provided by FirstEnergy. | |||
| ** Includes a $900,000 QZAB Allocation and $5,000,000 in proceeds from an upcoming Levy Issue. | |||
| *** Indicates the award of a Reserve Grant. Project and up to an additional $11,488,097 in future funding is Contingent upon the passage of an upcoming Levy Issue. | |||
| **** Indicates an additional SBA commitment of $10,000,000 commitment in a future funding cycle. | |||
FY2015 | |||
| The following Needs Grant awards were made by the Authority in their March 23, 2015 quarterly meeting: | |||
| County/Project | 2015 SBA Funds | | |
| Multi-Year Commitments from Previous Funding Cycles | | ||
Wayne New Ceredo Kenova ES, New Crum PK-8, Renovations to Wayne Co HS | $10,000,000 | | |
Hardy Add/Renov. at East Hardy HS & New Moorefield HS | $10,295,000 | | |
Brooke New Middle School and HVAC Renovations at Brooke County HS | $12,500,000 | | |
| Total | $32,795,000 | ||