Needs Grants

590017_1[1].jpgNeeds projects are the major capital improvement projects funded through the SBA's General Construction Fund. County Boards of Education submit capital improvement projects to the SBA for funding consideration. Projects are submitted and evaluated pursuant to the SBA's Policy and Procedures Handbook - Section 200 and Section 201.  

The process involves: Grant Application, SBA and WVBE approval of county CEFP (if necessary), SBA staff review including site visits, interviews by the Authority with County Superintendents and Board Presidents, and review and rating by the Architectural Services Staff. The Authority then completes the process with their deliberation and selection of the projects.

 

 


2024

The following Needs Grant awards were made by the Authority in their December 11, 2023 quarterly meeting:

​County​Project Description​Project Cost​Local Funds​Funds Awarded
Barbour
Phillippi ES Roof Replacement
​$1,692,102
​$50,000
​$1,642,102 
​Berkeley
​New Primary School (K-2), New Primary/Intermediate School (K-2/3-5)
​$66,546,738
​$41,546,738
​$8,333,333 1
​Calhoun
​Calhoun MS/HS Chiller and Boiler Replacement
​$4,919,829
​$80,000
​$4,839,829
​Fayette
New Midland Trail ES
​$21,625,860
​$6,000,000
​$15,625,860 
​Gilmer
​Gilmer County MS/HS Kitchen Walk-In Freezer Replacement
​$805,214
​$80,521
​$724,693
​Grant
​Petersburg ES Roof/HVAC Replacement & PreK Addition (4 Classroom)
​$5,255,330
​$500,000
​$4,755,330
​Greenbrier
​Frankford ES Addition/Renovations
​$7,307,058
​$600,000
​$6,707,058
​Hancock
​Oak Glen MS Pyrite Remediation
​$1,234,650
​$246,930
​$987,720 
​Harrison
​Nutter Fort Primary, Simpson ES Addition/Renovation
​$7,842,600
​$2,000,000
​$5,842,600
​Jackson
​Ripley MS Additions & Renovations
​$19,547,398
​$6,000,000
​$13,547,398
​Logan
​Logan MS Foundation & Structural Steel Stabilization
​$3,735,412
​$735,412
​$3,000,000
​Marshall
​New Benwood-McMechen ES​
​$16,295,270
​$7,081,715
​$9,213,555
​Mason
​Roosevelt ES Upgrades
​$1,249,000
​$0
​$1,249,000
​Morgan
​Berkeley Springs HS HVAC Replacement
​$407,881
​$40,781
​$367,100
​Randolph
​Elkins MS Roof Replacement
​$658,110
​$100,000
​$558,110
Taylor
​New Anna Jarvis ES
​$24,182,267
​$16,875,667
​$7,306,600
​Tucker
​Tucker County HS Waste Water Treatment Plant Replacement
​$2,015,945
​$50,000
​$1,965,945
Wood
New Lubeck ES, Vienna ES, & North Parkersburg ES
​$75,328,440
​$47,399,500
​$9,309,647 2
Wyoming
New Mullens PK-8 School
$24,464,847
$8,753,193
$15,711,654
Totals

$285,113,951
$138,140,457
$111,687,534

Notes:​

1. Indicates an additional SBA commitment of $8,333,333 in the FY-2025 and $8,333,333 in the FY-2026 Funding Cycles.

2. Indicates an additional SBA commitment of $9,309,647 in the FY-2025 and $9,309,647 in the FY-2026 Funding Cycles.


2022

The following Needs Grant awards were made by the Authority in their December 13, 2021 quarterly meeting: 

​​County​
​Project Description
Project Cost​
​Local Funds
​Funds Awarded
​Cabell
​New Meadows Elementary School​
​$16,999,000
​$6,999,000
​$10,000,000
​Kanawha
​Renovations to Cedar Grove Elementary School
​$11,788,285
​$3,288,285
​$8,500,000
​Lincoln
​New Duval Area PK-8 School
​$27,746,460
​$3,000,000
​$14,746,460 1
​McDowell
​New Consolidated Elementary School (Fall River, Kimball, Welch)
​$18,665,600
​$3,665,600
​$7,500,000 2
​Taylor
​Roof Replacement at Grafton High School
​$1,183,212
​$363,012
​$820,200
Multi-Year Commitments from Previous Funding Cycle​s ​
​Hampshire​New Augusta, Romney, and Slanesville Elementary Schools
​$8,000,000​$8,000,000 3
​Mineral​New Frankfort PK-4 Elementary School
​$9,573,795​$9,573,795
​Totals

​$93,956,352
​$17,315,897
​$59,140,455

Notes:​
1. Indicates an additional SBA commitment of $10,000,000 in the FY-2023 Funding Cycle.

2. Indicates an additional SBA commitment of $7,500,000 in the FY-2023 Funding Cycle. ​

3. Indicates an additional SBA commitment of $8,000,000 in the FY-2023 Funding Cycle.


2021

The following Needs Grant awards were made by the Authority in their April 19, 2021 quarterly meeting:

​County​Project Description
​Project Cost
​Local Funds
​Funds Awarded
​Greenbrier​Alderson Elementary School Relocation to Community Center
​$11,000,000​$3,000,000​$8,000,000
​Jefferson​New Shepherdstown Elementary & New Ranson Elementary Schools
​$40,013,668​$32,505,000​$7,508,668
​Mercer​New Bluewell-Brushfork PK-5 Elementary School
​$14,630,821​$5,000,000​$9,630,821
​Mineral​New Frankfort PK-4 Elementary School
​$21,275,100​$2,127,510​$9,573,795 1
​Ohio​Renovations to Six (6) Schools
​$23,301,212​$5,301,212​$18,000,000
​Roane​New Spencer Middle School
​$15,500,100​$1,550,010​$13,950,090
​Summers​Summers Co Middle-High School Additions / Renovations
​$8,199,876​$ 0​$8,199,876
Multi-Year Commitments from Previous Funding Cycles ​ ​ ​ ​ ​
Hampshire​​New Augusta, Romney, and Slanesville Elementary Schools
​$42,927,955​$18,927,955​$8,000,000 2
Totals​$141,920,777​$49,483,732​$82,863,250

Notes:
1. Indicates an additional SBA commitment of $9,573,795 in the FY-2022 Funding Cycle.

2. Indicates an additional SBA commitment of $8,000,000 in the FY-2022 and $8,000,000 in the FY-2023 Funding Cycles.


2021

The following Needs Grant awards were made by the Authority in their July 30, 2020 special meeting: 
​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
Mineral
​HVAC & Roofing Renovations at Keyser Middle School ​$3,731,670 ​$645,000 ​$3,086,670
​Raleigh ​New Stratton Elementary School
​$15,882,374 ​$7,000,000 ​$8,882,374
​Totals ​$19,614,044 ​$7,645,000 ​$11,969,044
 

2020

The following Needs Grant awards were made by the Authority in their December 17, 2019 quarterly meeting: 
​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Fayette ​New Meadow Bridge PreK-12 School ​$20,012,448 ​$0 ​$20,012,448
​Harrison ​Gore Elementary School Addition / Renovation (Former United HS)
​$8,130,000 ​$2,000,000 ​$6,130,000
​Marion ​East Dale Elementary School Addition
​$3,154,650 ​$1,577,325 ​$1,577,325
Multi-Year​ ​Commitments from Previous Funding Cycles​ ​
​Fayette​Phase II Upgrades & Renovations to Fayette County Schools
​$6,605,223​$6,605,223
​Monroe​New Peterstown PreK-8 School
$10,100,000​​$10,100,000
​Totals ​$48,002,321 ​$3,577,325 ​$44,424,996
 

2019

The following Needs Grant awards were made by the Authority in their December 10, 2018 quarterly meeting:

​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Braxton ​Sutton E.S. HVAC; Braxton Co. HS Kitchen Hood Replacement ​$1,082,885 ​$250,000 ​$832,885
​Calhoun ​Pleasant Hill Elementary School HVAC Renovations
​$290,359 ​$0 ​$290,359
​Clay ​Clay County High School Additions & Renovations
​$9,360,078 ​$0 ​$9,360,078
​Fayette ​Phase II Upgrades & Renovations to Fayette County Schools
​$15,210,446 ​$2,000,000 ​$6,605,223 1
​Grant ​New Roof & Sewage Treatment Plant at Union Ed. Complex ​$1,831,724 ​$0 ​$1,831,724
​Lewis ​Lewis County High School Roof Replacement
​$2,593,604 ​$0 ​$2,593,604
​Mingo ​Gilbert PreK-8 Phase II Renovations ​$1,943,630 ​$200,000 ​$1,743,630
​Monroe ​New Peterstown PreK-8 School ​$24,192,000 ​$3,092,000 ​$11,000,000 2
​Morgan ​Widmyer Elementary School Roof Replacement ​$982,607 ​$150,000 ​$832,067
​Nicholas ​Panther Creek ES, Zela ES, Nicholas Co. HS Roof Replacement ​$1,207,118 ​$241,424 ​$965,694
​Ohio ​Triadelphia MS & Bridge Street ES Renovations ​$11,729,160 ​$2,729,160 ​$9,000,000
​Pendleton ​Pendleton Co. HS & North Fork ES HVAC & Roof Replacement ​$8,562,722 ​$200,000 ​$8,362,722
​Pleasants ​Belmont ES, St. Marys ES, Pleasants Co. MS Roof & HVAC Reno. ​$1,196,230 ​$299,080 ​$897,150
​Putnam ​Hurricane High School Additions & Renovations
​$3,000,233 ​$500,000 ​$2,500,233
​Randolph ​Elkins High School Roofing & HVAC
​$2,514,342 ​$0 ​$2,514,342
​Summers ​Summers Co. HS HVAC & Cooling Tower Replacement ​$4,125,750 ​$0 ​$4,125,750
​Tucker ​Tucker Valley ES/MS HVAC Renovations
​$4,233,743 ​$0 ​$4,233,743
​Upshur ​Hodgesville Elementary School Additions & Renovations ​$2,208,389 ​$0 ​$2,208,389
​Wayne ​County-Wide Roof Replacements
​$2,826,147 ​$262,417 ​$2,600,000
​ ​ ​ ​ ​Multi-Year​ ​Commitments from Previous Funding Cycles​ ​
​Cabell​New Highlawn Elementary School
​$2,473,807​$2,473,807
​Mercer​New PK-2 Elementary School
​$4,516,553​$4,516,553
​Wood​Wood Co. Technical Center Additions and Renovations
​$2,911,337$2,911,337​
​Totals ​$108,992,324 ​$9,924,081 ​$82,399,290
 
Notes
:
1. Indicates an additional SBA commitment of $6,605,223 in the FY-2020 Funding Cycle.
2. Indicates an additional SBA commitment of $10,100,000 in the FY-2020 Funding Cycle.
 
 

2018

The following Needs Grant awards were made by the Authority in their December 11, 2017 quarterly meeting:

​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Cabell ​New Highlawn Elementary School ​$13,237,078 ​$6,618,539 ​$4,144,732 1
​Calhoun ​Calhoun Co. MS-HS Sanitation Renovations ​$895,118 ​$0 ​$895,118
​Hampshire ​Augusta Elementary School Partial Roof Replacement
​$224,750 ​$56,188 ​$168,562
​Hancock ​Weir Middle School Roof Replacement ​$1,270,000 ​$270,000 ​$1,000,000
​Kanawha ​Ben Franklin Career Center HVAC & Roof Replacement ​$8,740,949 ​$1,748,190 ​$6,992,759
​Lincoln ​Roof Replacement at Five (5) Schools
​$1,208,925 ​$208,925 ​$1,000,000
​Mason ​Fire Alarm System Replacement at Two (2) Schools
​$535,846 ​$133,961 ​$401,885
​Mercer ​New PK-2 Elementary School ​$12,204,032 ​$1,500,000 ​$6,187,479 2
​Mingo ​Gilbert Elementary / Middle School Renovations ​$1,226,365 ​$310,000 ​$916,365
​Monongalia ​Morgantown High School Additions & Renovations ​$5,365,510 ​$1,341,377 ​$4,024,133
​Monroe ​New Peterstown PK-8 School ​$24,192,000 ​$0 ​$100,000 3
​Pleasants ​Safe School Entrance Renovations at Two (2) Schools
​$546,463 ​$81,969 ​$464,494
​Preston ​Roof Replacement at Two (2) Schools ​$1,292,400 ​$0 ​$1,292,400
​Randolph ​Additions & Renovations at Two (2) Schools
​$5,497,458 ​$100,000 ​$5,397,458
​Ritchie ​Ritchie Co. MS-HS Access Control & Energy Management ​$2,016,575 ​$604,144 ​$1,412,431
​Tucker ​Davis Thomas ES-MS Roof Replacement & Site Drainage ​$828,647 ​$0 ​$828,647
​Tyler ​Roof Replacement at Two (2) Schools ​$1,572,000 ​$393,000 ​$1,179,000
​Upshur ​Tennerton Elementary School Roof Replacement ​$546,164 ​$0 ​$546,164
​Wayne ​Spring Valley HS HVAC & Roof Replacement
​$3,836,750 ​$200,000 ​$3,636,750
​Wirt ​Wirt Co. Primary-MS Restroom Renovation & Security Upgrades ​$1,283,053 ​$270,347 ​$1,012,706
​Wood ​Wood Co. Technical Center Additions & Renovations
​$9,992,000 ​$2,498,400 ​$4,582,263 4
​Wyoming ​Wyoming East High School HVAC & Roof Replacement
​$4,054,500 ​$1,012,000 5 ​$3,042,500
​ ​​ ​Multi-Year​ ​Commitments from Previous Funding Cycles ​ ​ ​
​Fayette​New PK-2 Elementary School & New Collins Middle School
​$9,385,215​$9,385,215
​Totals ​$109,951,798 ​$17,347,040 ​$58,611,061
 Notes:
1. Indicates an additional SBA commitment of $2,473,807 in the FY-2019 Funding Cycle.
2. Indicates an additional SBA commitment of $4,516,553 in the FY-2019 Funding Cycle.
3. Indicates the award of a Reserve Grant.
4. Indicates an additional SBA commitment of $2,911,337 in the FY-2019 Funding Cycle.
5. Includes a $992,000 QZAB Allocation.

2017

The following Needs Grant awards were made by the Authority in their December 12, 2016 quarterly meeting:
​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Berkeley ​Energy Management Upgrades ​$17,476,000 ​$12,576,000 ​$4,900,000 1
​Calhoun ​Calhoun Co. Middle-High School Sanitation Renovations ​$189,545 ​$0 ​$189,545
​Clay ​Clay Elementary School Roof Replacement ​$160,000 ​$5,000 ​$155,000
​Fayette ​New PK-2 Elementary School & New Collins Middle School ​$39,635,712 ​$17,000,000 ​$13,250,497 2
​Greenbrier ​Western Greenbrier Middle School Addition $5,370,501 ​$500,000 ​$4,870,501
​Hardy ​East Hardy Early-Middle School HVAC & Roof Replacement
​$3,500,000 ​$500,000 ​$3,000,000
​Mason ​Roof Replacement at Three (3) Schools ​$1,035,775 ​$245,055 ​$790,720
​Mercer ​New Green Valley Elementary School ​$12,083,200 ​$4,229,120 3 ​$7,854,080
​Monongalia ​South Middle School Additions & Renovations ​$4,192,766 ​$2,192,766 ​$2,000,000
​Monroe ​New Peterstown PK-8 School ​$24,192,000 ​$10,000,000 4 ​$500,000 5
​Morgan ​Berkeley Springs High School Renovations ​$6,114,779 ​$1,000,000 6 ​$5,114,779
​Pleasants ​Pleasants Co. Middle School ADA Restroom Renovations ​$538,465 ​$80,770 ​$457,695
​Preston ​Roof Replacement at Four (4) Schools
​$789,242 ​$0 ​$789,242
​Taylor ​Taylor Co. Middle School Heat Pump Replacement ​$1,973,655 ​$600,000 ​$1,373,655
​Tyler ​Tyler Consolidated High School HVAC Renovations ​$4,598,578 ​$900,000 ​$3,698,578
Multi-Year Commitments from Previous Funding Cycles​ ​ ​ ​ ​
​Raleigh   
​New Elementary School & Renovations to Shady Spring High School
$10,000,000​​$10,000,000
​Totals ​$131,850,218 ​$49,828,722 $​58,944,292
Notes
1. Includes a $100,000 energy grant provided by FirstEnergy.
2. Indicates an additional SBA commitment of $9,385,215 in a future funding cycle.
3. Includes a $500,000 QZAB Allocation.
4. Includes a $1,000,000 QZAB Allocation and $8,000,000 in proceeds from an upcoming Bond Issue.
5. Indicates the award of a Reserve Grant. Project and up to an additional $13,692,000 in future funding is contingent upon the passage of an upcoming Bond Issue.
6.Includes a $1,000,000 QZAB Allocation.


2016​

The following Needs Grant awards were made by the Authority in their December 14, 2015 quarterly meeting:  

​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Barbour ​Energy Management Upgrades at Seven Schools ​$6,952,522 ​$2,359,200 ​$4,593,322
​Calhoun ​HVAC Renovation & Roof Replacement at Calhoun Middle-High School ​$1,146,239 ​$50,001 ​$1,096,238
​Doddridge ​Additions & Renovations at Doddridge Co High School ​$2,800,000 ​$2,000,000 ​$800,000
​Harrison New Johnson Elementary​ ​$16,778,000 ​$6,000,000 ​$10,778,000 *
​Jackson ​Middle School Addition to Ravenswood High School ​$13,312,177 ​$3,100,000 ​$10,212,177
​Kanawha Additions & Renovations to Andrews Heights Elementary School​ ​$2,955,612 ​$1,200,000 ​$1,755,612
​Logan ​New Chapmanville Elementary ​$12,550,144 ​$6,050,144 ​$6,500,000
​Monongalia ​Additions & Renovations to Brookhaven Elementary School ​$6,235,000 ​$1,875,000 ​$4,360,000
​Pleasants ​Entrance & ADA Renovations at Pleasants Co Middle School ​$372,466 ​$55,870 ​$316,596
​Pocahontas ​Renovations to Marlinton Middle School & Green Bank Elementary School ​$6,000,000 ​$5,900,000 ** ​$100,000 ***
​Raleigh ​New Elementary School & Renovations to Shady Spring High School ​$40,815,548 ​$20,815,548 ​$10,000,000 ****
​Roane ​Physical Education Addition at Spencer Elementary School ​$1,077,900 ​$107,790 ​$970,110
​Tucker ​HVAC Renovations at Tucker County High School ​$2,506,839 ​$200,000 ​$2,306,839
​Webster ​Roof Renovations at Webster Springs Elementary School ​$741,078 ​$25,000 ​$716,078
​Wirt ​Roof Replacement & Exterior Waterproofing at Two Schools ​$2,659,651 ​$500,000 ​$2,159,651
​Total ​$116,903,176 $​50,238,553 $​56,664,623

* Includes a $100,000 energy grant provided by FirstEnergy.

** Includes a $900,000 QZAB Allocation and $5,000,000 in proceeds from an upcoming Levy Issue.

*** Indicates the award of a Reserve Grant. Project and up to an additional $11,488,097 in future funding is Contingent upon the passage of an upcoming Levy Issue.

**** Indicates an additional SBA commitment of $10,000,000 commitment in a future funding cycle.

 ​2015

​​The following Needs Grant awards were made by the Authority in their March 23, 2015 quarterly meeting:

​County ​Project Description ​2015 SBA Funds
​Multi-Year Commitments from Previous Funding Cycles​ ​ ​ ​
​Wayne ​New Ceredo Kenova ES, New Crum PK-8, Renovations to Wayne Co HS ​$10,000,000
​Hardy ​Add/Renov. at East Hardy HS & New Moorefield HS ​$10,295,000
​Brooke ​New Middle School and HVAC Renovations at Brooke County HS ​$12,500,000
​Total ​$32,795,000
 

  

2014

The following Needs Grant awards were made by the Authority in their April 28, 2014 quarterly meeting:

​County ​Project Description ​Project Cost ​Local Funds ​QZAB ​Funds Awarded
​Brooke

​New Middle School and HVAC Renovations at Brooke County HS

​$100,000 ​$0 ​$0 ​$100,000 *
​Doddridge

​2 Classroom Addition at Doddridge County Elementary School

​$880,569 ​$500,000 ​$0 ​$380,569
​Gilmer

​New Gilmer County Elementary School

​$14,327,232 ​$1,117,977 ​$1,000,000 ​$12,209,255
​Mingo

​Additions/Renovations to Burch Middle School

​$9,608,879 $1,000,000​ $0​ $8,608,879​
​Monongalia

​New Suncrest Elementary School

​$15,452,803 $6,787,811​ $0​ ​$8,664,992
​Ohio

​Renovations to Ritchie Elementary School

​$6,772,932 $1,380,481​ $0​ $5,392,451​
​Wayne

​New Ceredo Kenova ES, New Crum PK-8, Renovations to Wayne Co HS

​$42,200,000 $22,200,000​ $2,000,000​ $8,000,000 **​
Multi-Year Commitment from Previous Funding Cycles ​ ​ ​ ​ ​
​Hardy ​Add/Renov. at East Hardy HS & New Moorefield HS ​$11,000,000 $11,000,000​
Total

​$100,342,415 $32,986,269​ $3,000,000​ $54,356,146​

  *Contingent upon passage of a local bond.

**Contingent upon passage of a local bond. $10,000,000 also committed in the second year if the bond passes.

 

The following Needs Grant Award was made by the Authority in thier Special Emergency Meeting on January 23, 2014:

​County ​Project Description ​Additional Local Funds ​SBA Funds Awarded
​​Multi-Year Commitment from Previous Funding Cycles
​McDowell ​New Iaeger Elementary School ​$800,000 $​7,050,000
 

 

 

2013

The following Needs Grant Awards were made by the Authority in their April 22, 2013 quarterly meeting:

​County ​Project Description ​Project Cost ​Local Funds QZAB ​Funds Awarded
​Berkeley ​Renovations at Martinsburg North Middle School ​$10,259713 ​$4,359,713 $0​ ​$5,900,000
​Boone ​Addition/Renovations at Sherman JHS/HS ​$2,458,2222 ​$737,466 $0 ​$1,720,756
​Cabell ​Addition/Renovations at Culloden Elementary School ​$7,530,307 ​$4,000,000 $0 ​$3,530,307
​Harrison ​New Lumberport Middle School ​$13,197,000 ​$4,000,000 ​$1,000,000 ​$8,197,000
​Lewis ​Addition/Renovations at Jane Lew Elementary School ​$4,136,140 ​$1,000,000 ​$0 ​$3,136,140
​Pendleton New Franklin Elementary​ ​$10,853,700 ​$350,000 ​$824,000 ​$9,824,700
​Preston ​New West Preston Middle School ​$13,246,157 ​$5,246,157 $0​ ​$4,000,000 *
​Ritchie ​Addition/Renovations at Harrisville Elementary School ​$4,866,456 ​$300,000 ​$0 ​$4,566,456
​Webster ​Renovations at Webster County High School ​$4,551,584 ​$100,000 ​$0 ​$4,451,584
​Wetzel ​Window Replacement at 3 Schools ​$394,908 ​$155,028 ​$0 ​$239,880
​Wood ​Addition/Renovations at Edison Middle School ​$3,287,160 ​$657,432 ​$0 ​$2,629,728
Wyoming​ ​New Huff Consolidated Elementary/Middle School ​$10,219,440 $2,554,860​ $0​ $1,250,000 **​
​​Multi-Year Commitments from Previous Funding Cycles ​ ​ ​ ​ ​
​Jackson ​New Kenna Elementary School ​$6,394,730 ​​$6,394,730
​Kanawha ​New Westside #2 PK-5 (Edgewood ES) ​$421,590 ​$421,590
​Mercer ​New Oakvale Elementary School ​$3,708,942 ​$3,708,942
​Total ​$95,526,049 ​$23,460,656 $1,824,000​ $59,971,813​

  *An additional $4,000,000 in SBA funding was awarded for this project in the previous funding cycle.

**An additional $6,414,580 in SBA funding was awarded for this project in the previous funding cycle.
 
 
The following Needs Grant Award was made by the Authority in the March 11, 2013 meeting:
​County ​Project Description ​2013 SBA Funds
Multi-Year Commitments from Previous Funding Cycles ​
​Marshall ​Add/Renov. at John Marshall High School ​$6,750,000
  
 
 
 

2012

The following Needs Grant Award was made by the Authority in thier June 25, 2012 quarterly meeting:
​County ​Project Description ​Total Project Cost ​Local Bond Funding ​2014 Funds ​2015 Funds
​Hardy ​Add/Renov. at East Hardy HS & New Moorefield HS ​$43,015,669 ​$21,507,835 ​$11,000,000 ​$10,257,834
 
 
The following Needs Grant Awards were made by the Authority in their April 23, 2012 quarterly meeting:
​County ​Project Description ​Project Cost ​Local Funds QZAB​ ​Funds Awarded
​Lewis/Gilmer ​New Lewis/Gilmer Combined Elementary School ​$9,676,800 ​$0 ​$0 ​$9,676,800
​Hardy ​Add/Renov. at East Hardy HS & New Moorefield HS ​$250,000 ​$0 ​$0 ​$250,000 *
​Wyoming ​New Huff Consolidated Elementary/Middle School ​$10,219,440 ​$3,804,860 ​$0 ​$6,414,580
​Logan ​New Logan Elementary School ​$17,732,351 ​$8,732,351 ​$0 ​$9,000,000 **
​Barbour ​Add/Renov. at Philip Barbour High School ​$1,614,752 ​$212,447 ​$0 ​$1,402,305
​Marshall ​Add/Renov. at John Marshall High School ​$250,000 ​$0 ​$0 ​$250,000 *
​Morgan ​Renovations of Building C at Berkeley Springs High ​$4,200,000 ​$1,176,000 ​$824,000 ​$2,200,000 **
Wirt​ ​HVAC Renov. at Wirt County Primary/Middle ​$1,791,321 ​$391,321 ​$0 ​$1,400,000
​Pocahontas ​Add/Renov. at Hillsboro Elementary ​$1,429,061 ​$90,000 $0​ ​$1,339,061
Clay ​HVAC Renov. at Clay County Middle ​$2,049,640 ​$399,640 ​$0 ​$1,650,000
​Preston ​New West Preston MIddle School ​$9,246,157 ​$5,246,157 ​$0 ​$4,000,000
​Tyler ​HVAC Renov. at Tyler Consolidated Middle/High ​$903,862 ​$200,000 ​$0 ​$703,862
​Cabell ​New Beverly Hills/Enslow Middle Green School Allocation ​$500,000 ​$- ​$- ​$500,000
Multi-Year Commitments from Previous Funding Cycles ​ ​ ​ ​ ​
​Berkeley ​New Spring Mills High School ​$12,400,000 $12,400,000​
​Kanawha ​New Westside #2 PK-5 (Edgewood ES) $578,000​ $578,000​
Total ​$72,841,384 ​$20,252,776 ​$824,000 ​$51,764,608
   *Planning grant awarded. Future funds contingent upon passage of a local bond.
 **Grant later forfeited.
 
 
 

2011

The following Needs Grant Awards were made by the Authority in thier June 27, 2011 quarterly meeting:
​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Jackson ​New Kenna Elementary School ​$11,014,038 ​$2,276,000 ​$8,738,038
​Mercer ​New Oakvale Elementary School ​$6,868,060 ​$1,800,000 ​$5,068,060
​Mingo ​Addition/Renovations at Riverside Elementary School ​$4,398,154 ​$1,250,000 ​$3,148,154
​Putnam ​Addition/Renovations at Winfield Elementary School ​$7,290,638 ​$2,807,973 ​$4,482,665
Total ​$29,570,890 ​$8,133,973 ​$21,436,917
 
The following Needs Grant Awards were made by the Authority in their April 11, 2011 quarterly meeting:
​County ​Project Description ​Project Cost ​Local Funds SBA ​Emer. Funds ​Funds Awarded
​Berkeley ​New Gerrardstown Area Middle School ​$18,015,283 ​$8,000,000 ​$0 ​$10,015,283
​Boone Addition/Renovations at ​Sherman JHS/HS ​$15,774,253 ​$9,774,253 $0​ ​$6,000,000 *
​Calhoun ​New Arnoldsburg Elementary School ​$8,583,520 ​$2,987,358 ​$2,000,000 ​$3,596,162
​Harrison ​New North Harrison Middle School ​$19,550,000 ​$11,300,000 ​$0 ​$8,250,000 *
​Jefferson Addition/Renovations at Harpers Ferry MS ​$6,571,862 ​$2,500,000 ​$0 ​$4,071,862
​Pleasants ​New St. Marys High School ​$25,945,836 ​$12,972,918 ​$0 ​$12,972,918
​Preston ​New Central Preston Middle School ​$15,555,636 ​$7,555,636 ​$0 ​$8,000,000
​Upshur ​New Buckhannon-Upshur Middle School ​$27,606,747 $14,419,830​ ​$0 ​$13,186,917 *
​Wyoming ​New Pineville Elementary School ​$11,746,560 ​$2,349,312 ​$2,000,000 ​$7,397,248
Multi-Year Commitments from Previous Funding Cycles​
​Berkeley ​New Spring Mills High School ​$12,500,000 ​$12,500,000
Cabell​ ​New Beverly Hills/Enslow Middle School ​$15,185,396 ​$15,185,396
​Hancock ​New Weirton Elementary School ​$9,500,000 ​$9,500,000
​Marion ​New East Fairmont Middle School ​$7,500,000 ​$7,500,000
​Raleigh ​New Marsh Fork Elementary School ​$500,000 ​$500,000
Total ​$194,535,093 ​$71,859,307 ​$4,000,000 ​$118,675,786
 *Contingent upon the passage of a local bond (Bond failed, grant forfeited)
 
 
 

2010 

The following Needs Grant Awards were made by the Authority in their April 26, 2010 quarterly meeting:  
​County ​Project Description ​Project Cost ​Local Funds ​Funds Awarded
​Gilmer ​Two New Elementary Schools ​$17,543,680 ​$8,771,840 ​​$8,771,840 *
​Hancock ​New Weirton Elementary School ​$11,943,400 ​$2,443,400 ​$9,500,000 **
​Kanawha ​New Westside #2 PK-5 (Edgewood ES) ​$11,783,952 ​$2,945,988 ​$8,837,964
​Marion ​New East Fairmont Middle School ​$14,000,000 ​$7,060,000 ​$6,940,000 **
​Monongalia ​New Eastwood Elementary School ​$11,491,200 ​$2,872,800 ​$8,618,400
Nicholas​ ​New Gauley River Elementary School ​$10,944,000 ​$2,736,000 ​$8,208,000
​Preston ​New South Preston Area Elementary School ​$19,116,200 ​$11,116,200 ​$8,000,000
​Raleigh ​New Marsh Fork Elementary School ​$8,656,704 ​$6,010,473 ​$2,646,231
​Wayne ​New Fort Gay Elementary/Middle School ​$19,110,094 ​$3,300,000 ​$15,810,094
Multi-Year Commitments from Previous Funding Cycles​ ​ ​ ​ ​
​Cabell ​New Beverly Hills/Enslow Middle School ​$4,000,000 ​$4,000,000 **
Marshall​ ​New Cameron High School ​$8,301,238 ​$8,301,238
​Putnam ​County-Wide Building Program ​$10,000,000 ​$10,000,000
Total ​$146,890,468 ​$47,256,701 ​$99,633,767

 *Contingent upon the passage of a local bond (Bond failed, grant forfeited)

**Indicates SBA funding commitment in future funding cycles

 

 

2009

The following Needs Grant Awards were made by the Authority in their April 20, 2009 quarterly meeting:

​County ​Project Description ​Funds Awarded
​Barbour ​Additions/Renovations at Junior Elementary ​$1,048,691
​Berkeley ​New Spring Mills High School ​$100,000 *
​Brooke Renovations at ​Follansbee Middle School ​$1,307,392
​Cabell ​New Beverly Hills/Enslow Middle School ​$100,000 **
​Fayette ​New Fayette Plateau High School ​$100,000 ***
​Hardy ​Moorefield Elementary Renovations ​$4,263,096
​Harrison ​New Lumberport Elementary ​$6,679,100
​Jefferson ​New Elementary School ​$7,571,500
​Marshall ​New Cameron High School ​$15,000,000 **
​Putnam ​County-Wide Building Program ​$11,745,736 **
​Ritchie ​Additions/Renovations at Smithville Elementary ​$4,379,162
​Roane Additions/Renovations at ​Geary Elementary ​$5,006,386
Multi-Year Commitments from Previous Funding Cycles​ ​ ​ ​ ​ ​ ​
​Braxton ​Additions/Renovations at Six Elementary Schools ​$3,900,000
​Greenbrier ​County-Wide Building Program ​$10,529,950
​Lincoln ​New Harts PK-8 School ​$6,343,520
​Mercer ​New Pikeview Middle School ​$6,245,844
​Mingo ​New Mingo-Central Comprehensive High School ​$12,642,721
​Total ​$96,963,098

 *Contingent upon the passage of a local bond (indicates commitment to future funding cycles)

**Indicates SBA funding commitment in future funding cycles

***Contingent upon the passage of a local bond (Bond failed, grant forfeited)

 

 

For SBA funding information prior to 2009, please contact the SBA Staff.